Completion of Dredging Maintenance of our marine interface for our 2 Jetties
Excavating the waterfront of the two berths to achieve the designed depth of (12) meters at the lowest ebb and a distance of (100) meters towards the navigation channel.
Info
ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
Ardh Al-muheet Co.
ــــــــــــــــــــــــــــــــــــــــــــ
- For import, export, processing, transportation and production of asphalt and oxidized asphalt
Wahaj Al-Thuraya Co.
ـــــــــــــــــــــــــــــــــــــــــــــــــــ
- For Investments and Wharves Management FZE wharves