17- Preparing and installing integrated lighting towers and culumns for the site, with all electrical extensions, including cables and joints, digging trenches, burying with sand, laying concrete slabs and warning tapes, constructing manholes for wiring, manholes connecting with columns, and rehabilitating damaged columns.